Salem Foundation Pros logoSalem Foundation ProsFoundation Repair · Salem, UT
Piering And Underpinning photo

Salem Foundation Pros

Piering and Underpinning in Salem, UT

Piering and underpinning with helical and steel push piers, free estimates and written scope before any excavation starts.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Salem and nearby communities.

Settling foundations don't stop on their own, and in Salem the mix of spring runoff near Salem Pond and the region's active Wasatch Fault zone means structural support has to be sized for real ground movement, not guesswork. Salem Foundation Pros uses steel push piers and helical piers to carry a settling foundation down to load-bearing soil or bedrock, stopping further movement and giving the structure a stable base it didn't have before.

This is structural work, not a cosmetic patch. We inspect the settlement pattern, calculate pier spacing, and give you a written scope before any excavation starts, so you know exactly what's being installed and why.

What's included

What's Included with Piering and Underpinning

Typically included: foundation inspection and settlement measurement, pier spacing and load calculation, pier installation (steel push or helical), bracket attachment to the footing, hydraulic lift and leveling check, backfill and site cleanup.

Optional: interior crack injection on affected walls, drainage grading at pier access points, follow-up monitoring visit.

Customer prep: clear access along the foundation perimeter, move landscaping or stored items away from work areas, note which doors/windows have been sticking.

How it works

How Our Piering and Underpinning Process Works

  1. Load Assessment photo
    Step 1

    Load Assessment

    We analyze the structure's weight distribution to determine how many piers and where.

  2. Access Excavation photo
    Step 2

    Access Excavation

    Small excavation points are opened along the foundation perimeter.

  3. Pier Driving photo
    Step 3

    Pier Driving

    Steel or helical piers are driven or screwed to stable soil or bedrock.

  4. Load Transfer photo
    Step 4

    Load Transfer

    Brackets connect each pier to the footing to redistribute structural weight.

  5. Leveling Adjustment photo
    Step 5

    Leveling Adjustment

    Hydraulic jacks carefully raise the foundation toward its original position.

  6. Site Restoration photo
    Step 6

    Site Restoration

    Excavated areas are backfilled, compacted, and graded to match the yard.

Materials

Materials and Methods for Piering and Underpinning

Pier type and hardware are matched to Salem's soil layers and seismic standards, not a one-size approach.

  • Steel Push Piers photo

    Steel Push Piers

    Driven to refusal for deep, reliable support on heavier homes settling near Salem's lower-elevation, higher water table lots.

  • Helical Piers photo

    Helical Piers

    Screwed to depth for lighter structures or additions, useful where soil varies across a single lot.

  • Underpinning Brackets photo

    Underpinning Brackets

    Connect piers securely to the existing footing so load transfers evenly instead of concentrating stress at one point.

  • Hydraulic Lift Systems photo

    Hydraulic Lift Systems

    Allow controlled, incremental elevation changes so the structure is raised without shocking the framing.

  • Galvanized Coatings photo

    Galvanized Coatings

    Protect steel components from corrosion in moisture-prone soil near the pond and low-lying lots.

  • Compacted Fill Material photo

    Compacted Fill Material

    Stabilizes soil around new piers so backfilled areas don't resettle the following season.

Timeline

How long does a Piering and Underpinning take?

Most jobs move from inspection to finished backfill within about a week, with timing depending on pier count and access.

  1. 01

    Consult and inspection

    same day

    .

  2. 02

    Written estimate and pier count

    1–2 days

    based on load calculation and soil observations.

  3. 03

    Pier installation

    1–3 days

    depending on perimeter length and pier spacing.

  4. 04

    Leveling and backfill

    1 day

    hydraulic lift and site restoration.

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and After Piering and Underpinning

  • Piering and Underpinning photo
    Before
  • Piering and Underpinning photo
    After

FAQs

Piering and Underpinning FAQs

How do I know if my house needs piering instead of just crack injection?

Crack injection seals an existing crack but doesn't stop settlement. If you're seeing stair-step cracks, a sloping floor, or doors that no longer latch, the foundation is still moving and needs piers to carry the load to stable ground.

How long does underpinning take for a typical house?

A standard single-story home usually takes 1-3 days for pier installation once the estimate is approved, plus the initial inspection and any permit lead time.

Is piering permanent?

Properly installed steel or helical piers driven to load-bearing soil don't need repeat installation. They're designed to carry the structure's weight for the life of the building.

What's the difference between steel push piers and helical piers?

Push piers are driven using the building's own weight as resistance and work well under heavier structures. Helical piers are screwed in and rely on their helix plates for bearing capacity, often used for lighter loads or additions.

Will piering fix my cracked walls too?

Piering stops the movement causing the cracks. Existing cracks are usually sealed separately with epoxy or polyurethane injection once the foundation is stable.

Next step

Get a Piering and Underpinning Estimate in Salem

Call (435) 296-3927 or request a free estimate, we'll inspect the settlement pattern and give you a written pier plan before any work starts.

Ask about Piering and Underpinning

Tell us about the project and how to reach you.

Call (435) 296-3927